Resume Oscar Mitra 06Oct2015r1

  • Published on
    13-Apr-2017

  • View
    125

  • Download
    1

Transcript

OSCAR A. MITRA 1570 Buckhill Lane, Breinigsville, PA 18031 Mobile: (484)-343-3292 Email:oscar.mitra@outlook.com _________________________________________________________________________________________________________ Resume 06 Oct 2015 Page 1 SUMMARY OF QUALIFICATIONS Over 8+ years experience as Project Manager of World Class Cement and Minerals Technology Company. Over 25+ years experience as Project Manager of a mechanical and structural steel fabrication and erection works company. Honed experience in project management of: cement, minerals, power plant rehabilitation works, air pollution control, coal handling system for CFB power plant and GSM Cell sites erection work. A proven track record of completing difficult multiple projects on schedule and budget. Excellent interpersonal skills, a professional attitude, and effective project team leader and organizer. EDUCATION Master in Business Administration Ateneo Graduate School of Business B.S. Electrical Engineering University of the Philippines Project Management Certificate University of Illinois at Chicago OTHER SKILLS & ASSOCIATION * Proficient in Microsoft Office Suite, Microsoft Project 2007, FLS Atlas Project Management System * Member Project Management Institute (PMI) RELEVANT EXPERIENCE CONSTRUCTION AND BUSINESS MANAGEMENT FLSMIDTH INC-2040 Avenue C, Bethlehem, PA 18031- (2007-present) Presently managing EPC (2015- present) Ash Grove Co., $140M 2600 STPD Cement Plant Expansion Project in Midlothian, Texas. Presently managing EPC (2014- present) CEMEX , $86M 2540MTPD Cement Plant Expansion Project in Odessa, Texas. Completed (2015) Pikalevo Soda, a 3700 MTPD Limestone/Nepheline Sinter Plant project in Russia, involving basic and detailed engineering. Presently managing (2012- present) OCP S.A. Downstream, the worlds largest Phosphate Flash Dryer project in Morocco (10 MTPY Capacity), an US$86M EP project, from contract negotiation, engineering design and project execution and commissioning exceeding customer expectation. Co-managed a US$225M cement plant projects (2007-2011) with Lafarge North America (Joppa, Exshaw & Harleyville) from contract negotiation, engineering design, and equipment supply within project timetable and budget in a manner that met customers expectation. Completed a US$16.0M project (2008-2013) involving the design, supply and commissioning of a 50TPH Coal Conversion Project Phase I for PT Vale Indonesia, Tbk. Managed a feasibility study project for Vale Canada for the upgrade of nickel plant phase 2. OSCAR A. MITRA 1570 Buckhill Lane, Breinigsville, PA 18031 Mobile: (484)-343-3292 Email:oscar.mitra@outlook.com _________________________________________________________________________________________________________ Resume 06 Oct 2015 Page 2 Monitor project progress using FLS proprietary Atlas Project Management System & Oracle Time Management System. EXTENDED STEEL FE , INC., & CNP INDUSTRIES.,INC.-Manila, Philippines (1990-2006) Oversaw contract negotiation, design, fabrication and successful erection and commissioning works within project timetable in a manner meeting customers expectation. Managed a staff of over 500 engineers and construction personnel. Estimated project costs, performed take-offs and developed project proposals working directly as EPC or with the EPC/General Contractor. Monitored project progress using Microsoft Project 2003 Managed a 100,000 sq. ft steel fabrication facility complete with SAW welding, press brake, shear, plate roller and other shop fabrication equipment. Partial List of Projects Handled: - United Pulp & Paper Corp (Philippines) CFB Boiler Project, 133 t/h Foster Wheeler; EPC project for Coal handling System and Turn-Around Duct Work (2005-2006) - Asia Pacific Energy Corp (APEC, Philippines) CFB Boiler Project, Foster Wheeler under Formosa Heavy Industries, Taiwan. Electrostatic Precipitator Fabrication, Erection and Commissioning works. (2004-05) - Malaya 600MW power plant rehabilitation work, K-1 & K-2(Korea Electric Power - Malaya, Philippines, 1996-97) Structural steel, ductwork and insulation works. - 500MW Siemens combined cycle natural gas power plant (Ballast Needham Intl.- Batangas, Philippines Cladding and Insulation work, (2001-2002) - Globe Telecom Phase 5-6 - 67 NOKIA GSM Cell sites roll-out with Greenfield towers (2001) - Globe Telecom Phase 1& 2 - 5 NOKIA GSM Cell sites roll-out (1994) - SMART COMMUNICATION 50- Microwave Relay Station for GSM Cell sites backbone roll-out (1994-1995) - Lafarge Coal Grinding Plant - (PEG.S.A Switzerland formerly Republic Cement- Bulacan, Philippines)- Mechanical & Structural Steel fabrication & erection works (1995-97) - Hardie Jardine Australia New fiber-cement board plant (Cabuyao, Philippines - 1997) Structural Steel fabrication & erection works - Various dust collections and electro-static precipitator system for air pollution control (Lurgi Gmbh Germany, Northern Cement Project-Philippines) - Bulk materials handling system including conveyor belt system Holcim Alsons Cement - Holcim Cement terminal Batangas Structural & Mechanical fabrication & erection works - Heidelberg Cement Grinding plant - Mechanical fabrication & erection works Bataan, Philippines OSCAR A. MITRA 1570 Buckhill Lane, Breinigsville, PA 18031 Mobile: (484)-343-3292 Email:oscar.mitra@outlook.com _________________________________________________________________________________________________________ Resume 06 Oct 2015 Page 3 - PT Semen Bosowa Supply of fabrication for electrostatic precipitator Sulawesi, Indonesia 2- Lurgi Gmbh Electrostatic Precipitators (ESP) Germany 3- FL Smidth Electrostatic Precipitators (ESP) Denmark 8- Korea Cottrell Electrostatic Precipitators (ESP) S. Korea 1- ELEX ESP (Switzerland) 2- Multi-cyclones for 2-300MW Bunker Fuel Fired Power Plant & associated gas duct and insulation works (Korean Electric Power Co. Phils., Inc) BUSINESS DEVELOPMENT (1980-2006) Successfully developed a continuing 34 years old industrial sales business in the field of industrial air filtration with annual turnover of $ 5.0M. Successfully developed a joint venture business with Korean investors in the field of food & pharmaceutical packaging (Aluminum Pilfer-proof caps manufacturing) with turnover of $2.5M. REFERENCES : Available upon request.