hoja de metrados.xls

  • Published on
    11-Nov-2014

  • View
    239

  • Download
    2

Embed Size (px)

Transcript

<p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 N01 01.01 01.01.01 01.01.01.01 01.01.01.02 01.01.01.03 01.01.02 01.01.02.01 ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M LIMPIEZA DE TERRENO TRAZO Y REPLANTEO MANUAL MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTO HASTA H=1.55 m EJE 1-1, EJE 2-2 EJE 3-3 EJE A-A EJE B-B,C-C,D-D EJE E-E 01.01.02.02 EXCAVACION PARA ZAPATAS ZAPATA Z-1 ZAPATA Z-2 01.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO SOBRE ZAPATA Z-1 SOBRE ZAPATA Z-2 EJE 1-1, EJE 2-2 EJE 3-3 EJE A-A EJE B-B,C-C,D-D EJE E-E RELLENO AREA 01.01.02.04 NIVELACION INTERIOR Y APISONADO FINAL DE TERRENO HISTORIAS CLINICAS CONSULTORIO MEDICINA FARMACIA TOPICO CUARTO DE REPOSO VEREDA FRONTAL 01.01.02.05 01.01.03 01.01.03.01 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA(30 m) OBRAS DE CONCRETO SIMPLE SOBRECIMIENTO CORRIDO (MURO DE CABEZA) MEZCLA 1:8 C-H + 25% P.M. EJE 1-1, EJE 2-2, EJE 3-3 EJE A-A EJE B-B EJE E-E 01.01.03.02 SOBRECIMIENTO CORRIDO (MURO DE SOGA) MEZCLA 1:8 C-H + 25% P.M. EJE 2-2 EJE C-C, D-D m m m m m m m</p> <p>PARTIDACONSTRUCCION PUESTO DE SALUD</p> <p>UND</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL</p> <p>Unid m m</p> <p>1.00 1.00 1.00</p> <p>15.5 15.5</p> <p>8.00 7.00</p> <p>1.00 124.00 108.50</p> <p>1.00 124.00 108.50 20.22</p> <p>1.00 1.00 1.00 1.00 3.00 1.00 6.00 2.00 5.00 2.00 8.00 7.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 area= area=</p> <p>8.85 4.00 9.90 1.75 3.60 4.00 1.20 1.20 1.00 1.00 0.90 0.66 8.85 4.00 9.90 1.75 3.60 4.00 54.25 3.125 6.5 4.25 4.25 6.5 17.1</p> <p>0.50 0.50 0.50 0.50 0.50 0.50 1.20 1.20 1.00 1.00</p> <p>1.60 0.70 0.70 1.00 1.00 1.00 1.30 2.00 1.30 2.00 0.90 0.90 0.40 0.40 0.40 0.40 0.40 0.40 1.00</p> <p>7.08 1.40 3.47 0.88 5.40 2.00 27.49 11.23 5.76 6.50 4.00 69.19 6.49 4.16 1.24 0.40 0.99 0.18 1.08 0.40 54.25 102.98 6.56 26.98 13.30 13.30 25.74 17.10 (7.16)</p> <p>0.35 0.25 0.25 0.25 0.25 0.25 1.00 2.10 4.15 3.13 3.13 3.96 1.00</p> <p>(7.16)</p> <p>(7.16) 14.20</p> <p>1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 2.00</p> <p>1.00</p> <p>8.2 1.80 13.61 2.75 2.13 3.13 3.13 3.00 3.13 3.13</p> <p>0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.15 0.15 0.15</p> <p>1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50</p> <p>3.08 0.68 5.10 1.03 0.80 1.17 2.35 3.49 0.68 1.41 1.41</p> <p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 N01.01.03.03 EJE 1-1, EJE 2-2, EJE 3-3 EJE A-A EJE B-B EJE E-E EJE 2-2 EJE C-C, D-D 01.01.03.04 SOLADO P/SUB BASE DE VIGA CIMENTACION Y ZAPATA H=0.10 EJE 1-1, EJE 2-2, EJE 3-3 Eje A-A Eje B-B , C-C- , D-D Y E-E ZAPATA Z-1 ZAPATA Z-2 01.02.00 01.02.01 01.02.01.01 OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS F'C= 210 Kg/cm2 SOBRE ZAPATA Z-1 SOBRE ZAPATA Z-2 01.02.01.02 01.02.02 01.02.02.01 ACERO FY=4200 Kg/cm2 EN ZAPATAS VIGAS DE CIMENTACION CONCRETO F'C= 210 KG/CM2 PARA VIGA DE CIMENTACION EJE 1-1, EJE 2-2, EJE 3-3 Eje A-A Eje B-B , C-C- , D-D Y E-E 01.02.02.02 01.02.02.03 01.02.03 01.02.03.01 ENCOFRADO Y DESENCOFRADO EN VIGA CIMENTACION ACERO FY = 4200 KG/CM2 PARA VIGA DE CIMENTACION COLUMNAS CONCRETO F'C=210 KG/CM2 PARA COLUMNAS COLUMNA C-1 COLUMNA C-2 COLUMNA C-3 01.02.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS (5 USOS) COLUMNA C-1 COLUMNA C-2 COLUMNA C-3 01.02.03.03 01.02.04 01.02.04.01 ACERO FY=4200 KG/CM2 PARA COLUMNAS VIGAS CONCRETO F'C=210 KG/CM2 PARA VIGAS VIGA VP-102(25X40) eje A-A,B-B,C-C ,D-D y E-E entre eje 1-1 y 3-3 VIGA VP-101(25X40) eje 1-1,2-2, y 3-3 entre eje A-A y E-E 01.02.04.02 ENCOFRADO Y DESENCOFRADO DE VIGAS (5 USOS) VIGA VP-102(25X40) eje A-A,B-B,C-C ,D-D y E-E entre eje 1-1 y 3-3 VIGA VP-101(25X40) eje 1-1,2-2, y 3-3 entre eje A-A y E-E 01.02.04.03 01.02.05 01.02.05.01 ACERO FY=4200 KG/CM2 PARA VIGAS LOSA ALIGERADA CONCRETO F'C= 210 KG/CM2 PARA LOSA ALIGERADA ENTRE LOS A-A,B-B,C-C ,D-D y E-E entre eje 1-1 y 3-3 VIGUETA DE 0.10X0.15 VIGUETA DE BORDE 01.02.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA (5 USOS) ENTRE LOS A-A,B-B,C-C ,D-D y E-E entre eje 1-1 y 3-3 m m Kg. m m Kg. m m Kg. m Kg. m m</p> <p>PARTIDAENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO (5 USOS)</p> <p>UNDm</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL 160.19 2.00 1.00 8.2 1.50 24.60 2.00 1.80 1.50 5.40 2.00 13.61 1.50 40.82 2.00 2.75 1.50 8.25 2.00 2.13 1.50 6.39 2.00 3.13 1.50 9.39 4.00 3.13 1.50 18.78 1.00 2.00 3.00 1.50 9.00 2.00 2.00 3.13 1.50 18.78 2.00 2.00 3.13 1.50 18.78 27.70 1.00 12.00 0.25 3.00 1.00 1.80 0.25 0.45 1.00 13.50 0.25 3.38 1.00 2.90 0.25 0.73 1.00 6.50 0.25 1.63 8.00 1.20 1.20 11.52 7.00 1.00 1.00 7.00</p> <p>9.26 8.00 1.20 7.00 1.00 ver metrado de aceros 1.20 1.00 0.50 0.50 5.76 3.50 204.37</p> <p>204.37</p> <p>5.00 1.00 12.50 1.00 2.00 1.00 15.50 1.00 3.00 1.00 7.00 1.00 94.78 ver metrado de aceros 0.25 0.25 0.25 0.25 0.25 0.50 0.50 0.50 0.50 0.50 1.56 0.25 1.94 0.38 0.88 596.67 94.78 596.67</p> <p>9.00 3.00 2.00 10.00 3.00 2.00 10.00 2.00 1.00 2.00 0.90 0.25 0.40 0.75 0.50 0.80 0.25 0.25 0.25 5.00 5.00 5.00 3.50 3.50 3.50 3.38 0.63 5.00 75.25 15.75 3.50 56.00 962.50 962.50</p> <p>ver metrado de aceros</p> <p>8.65 5.00 3.00 8.00 15.50 0.25 0.25 0.40 0.40 0.65 0.65 4.00 4.65 132.60 5.00 2.00 8.00 4.00 2.00 15.50 ver metrado de aceros 52.00 80.60 1296.58</p> <p>1296.58</p> <p>15.89 1.00 1.00 2.00 39.00 15.50 15.50 15.50 8.00 0.10 0.10 0.05 0.15 0.20 6.20 9.07 0.62 124.00 1.00 15.50 8.00 124.00 625.88</p> <p>01.02.05.03 01.02.05.04</p> <p>ACERO FY=4200 KG/CM2 PARA LOSA ALIGERADA LADRILLO HUECO DE ARCILLA 15X30X30 PARA UN AREA TOTAL DE LOSA ALIGERADA (M2)</p> <p>Kg. Und.</p> <p>ver metrado de aceros</p> <p>625.88 1,032.92</p> <p>124.00 CONSIDERANDO 8.33 UND/M2</p> <p>1032.9</p> <p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 N01.02.06 01.02.06.01 ALBAILERIA MURO DE LADRILLO CORRIENTE DE ARCILLA (CABEZA) MURO EJE 1-1 MURO EJE 2-2 MURO EJE 3-3 MURO EJE A-A MURO EJE B-B MURO EJE E-E 01.01.06.02 MURO DE LADRILLO CORRIENTE DE ARCILLA (SOGA) MURO EJE C-C MURO EJE D-D MURO EJE 2-2 02 2.01 ARQUITECTURA REVOQUES Y ENLUCIDOS m m</p> <p>PARTIDA</p> <p>UND</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL</p> <p>84.59 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.2 1.8 13.605 2.75 5.26 6.26 6.26 6.26 3 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 14.54 4.77 27.47 7.29 13.94 16.59 41.13 16.59 16.59 7.95</p> <p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 N02.01.01 MURO EJE 1-1 MURO EJE 2-2 MURO EJE 3-3 MURO EJE A-A MURO EJE B-B MURO EJE C-C MURO EJE D-D MURO EJE E-E 01.02.01.02 TARRAJEO EN EXTERIOR C/MORTERO 1:5 X 1.5 cm MURO EJE 1-1 MURO EJE 2-2 MURO EJE 3-3 MURO EJE A-A MURO EJE E-E 01.02.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS COLUMNA C-1 COLUMNA C-2 COLUMNA C-3 01.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS VIGA VP-01(25X40) eje A-A,B-B,C-C ,D-D y E-E entre eje 1-1 y 3-3 VIGA VP-01(25X40) eje 1-1,2-2, y 3-3 entre eje A-A y E-E 01.02.01.07 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS PUERTA P-1 PUERTA P-2 VENTANA V-1 VENTANA V-2 VENTANA V-3 01.02.01.08 BRUAS e=1/2" En columna EJE 1--1 ENTRE EJE A-A Y E-E En columna EJE 2--2 ENTRE EJE A-A Y E-E En columna EJE 3--3 ENTRE EJE A-A Y E-E En Columna EJE A-A ENTRE EJE 2-2 Y 3-3 En Columna EJE B-B ENTRE EJE 1-1 Y 3-3 En Columna EJE C-C, D-D Y E-E ENTRE EJE 1-1 Y 3-3 01.02.02 01.02.02.01 CIELORRASO TARRAJEO EN CIELORRASO ENTRE LOS EJE A-A Y E-E A EJE 1-1 Y 3-3 m m m m m m</p> <p>PARTIDATARRAJEO EN INTERIOR C/MORTERO 1:5 X 1.5 cm</p> <p>UNDm</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL 172.69 1.00 8.2 2.65 14.54 1.00 1.8 2.65 4.77 2.00 3 2.65 15.90 1.00 13.605 2.65 27.51 1.00 2.75 2.65 7.29 2.00 2.15 2.65 11.40 1.00 3.15 2.65 8.35 2.00 6.26 2.65 33.18 2.00 6.26 2.65 33.18 1.00 6.26 2.65 16.59 2.00 1.00 1.00 1.00 1.00 3.00 2.00 1.00 6.76 1.8 13.605 2.75 6.26 1.25 0.25 0.80 2.95 2.65 2.65 2.65 2.65 3.74 3.74 3.74 39.88 4.77 27.51 7.29 16.59 14.03 1.87 2.99 66.30 5.00 4.00 3.00 2.00 1.00 1.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.00 15.50 6.40 6.20 5.38 7.20 7.00 15.50 4.80 15.50 2.90 2.13 3.13 3.13 0.65 0.65 26.00 40.30 72.18 19.20 12.40 5.38 7.20 28.00 119.22 31.00 9.60 31.00 5.80 4.26 6.26 31.30 96.04</p> <p>18.89</p> <p>124.00 1.00 15.50 8.00 124.00 -</p> <p>01.02.03 01.02.03.01</p> <p>PISOS Y PAVIMENTOS PISOS m</p> <p>01.02.03.01.01 AFIRMADO DE e=10CM PARA PISOS INTERIORES HISTORIAS CLINICAS</p> <p>85.88 1.00 3.125 2.10 6.56</p> <p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 NCONSULTORIO MEDICINA FARMACIA TOPICO CUARTO DE REPOSO 01.02.03.01.02 PISO DE CONCRETO PULIDO COLOREADO e=4" HISTORIAS CLINICAS CONSULTORIO MEDICINA FARMACIA TOPICO CUARTO DE REPOSO 01.02.03.02 VEREDAS m 01.02.03.02.01 AFIRMADO DE e=10cm. PARA VEREDAS VEREDA FRONTAL 01.02.03.02.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS (5 USOS) VEREDA FRONTAL Y POSTERIOR (CONTORNO) VEREDA FRONTAL (SEPARACIONES) 01.02.03.02.03 VEREDA CONCRETO FROTACHADO E=4" BRUADO A 1 m. VEREDA FRONTAL 01.02.03.02.04 CONCRETO F'C=140 KG/CM2 EN UAS DE VEREDA VEREDA FRONTAL Y POSTERIOR 01.02.03.03 CUNETAS m m m m m</p> <p>PARTIDA</p> <p>UND</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL 1.00 6.5 4.15 26.98 1.00 4.25 3.13 13.30 1.00 4.25 3.13 13.30 1.00 6.5 3.96 25.74 85.88 1.00 1.00 1.00 1.00 3.125 6.5 4.25 4.25 6.5 2.10 4.15 3.13 3.13 3.96 6.56 26.98 13.30 13.30 25.74 15.50 1.00 2.00 7.00 1.00 1.00 15.5 15.50 2.30 15.50 15.5 1.00 0.15 0.20 1.00 0.10 0.10 15.50 4.71 3.10 1.61 15.50 15.50 0.47 0.47</p> <p>01.02.03.03.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS (5 USOS) CUNETA FRONTAL 01.02.03.03.02 CONCRETO F'C=140 KG/CM2 EN CUNETAS CUNETA FRONTAL 01.02.04 01.02.04.01 ZOCALOS Y CONTRAZOCALOS CONTRAZOCALOS</p> <p>6.20 1.00 2.00 15.50 15.50 0.20 0.20 0.10 6.20 0.31 1.00 0.31</p> <p>m</p> <p>01.02.04.01.01 CONTRAZOCALO DE CEMENTO SIN COLOREAR H= 30 cm. PULIDO EJE 2-2 EJE B-B ENTRE 1-1 Y 2-2 EJE 1-1 ENTRE B-B Y E-E 01.02.04.01.02 CONTRAZOCALO DE CEMENTO SIN COLOREAR H= 20 cm. PULIDO EJE 1-1 ENTRE B-B Y E-E EJE 2-2 ENTRE A-A Y E-E EJE 3-3 ENTRE A-A Y E-E EJE A-A EJE B-B EJE C-C Y D-D EJE E-E 01.02.05 01.02.05.01 CARPINTERIA DE MADERA VENTANAS DE MADERA VENTANA V-1 VENTANA V-2 VENTANA V-3 01.02.05.02 PUERTAS DE MADERA APANELADA PUERTA P-1 PUERTA P-2 01.02.06 01.02.06.01 CERRAJERIA CERRADURA PARA PUERTA DE TRES GOLPES Puerta P-1 Puerta P-2 01.02.06.02 BISAGRA CAPUCHINO DE 4"X4" Puerta P-1 Puerta P-2</p> <p>m</p> <p>14.97 1.00 1.00 1.00 2.40 3.37 9.2 9.2 3 2.35 14.35 3.13 2.13 3.62 7.01 7.01 2.40 3.37 9.20 81.58 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 9.20 6.00 2.35 14.35 3.13 4.26 7.24 28.04 7.01 15.68 1.00 1.00 4.00 2.09 2.30 2.20 1.20 1.00 0.60 1.30 1.30 2.60 2.60 1.25 2.99 11.44 14.56 3.00 2.00 9.36 5.20 5 3.00 2.003.00 2.00</p> <p>m</p> <p>m</p> <p>m</p> <p>Pza</p> <p>Pza</p> <p>15 3 2 3 39.00 6.00</p> <p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 N01.02.08 01.02.08.01 01.02.08.02 PINTURAS PINTURA DE CIELO RASO 2 MANOS ENTRE LOS EJE A-A Y E-E A EJE 1-1 Y 3-3 PINTURA DE VIGAS Y COLUMNAS EXT. E INT. 2 MANOS COLUMNA C-1 COLUMNA C-2 VIGA VP-01(25X40) eje A-A,B-B,C-C ,D-D y E-E entre eje 1-1 y 3-3 VIGA VP-01(25X40) eje 1-1,2-2, y 3-3 entre eje A-A y E-E 01.02.08.03 PINTURA EN MUROS INTERIORES. 2 MANOS TARRAJEO EN INTERIOR C/MORTERO 1:5 X 1.5 cm MURO EJE 1-1 MURO EJE 2-2 MURO EJE 3-3 MURO EJE A-A MURO EJE B-B MURO EJE C-C MURO EJE D-D MURO EJE E-E 01.02.08.03 PINTURA EN MUROS EXTERIORES MURO EJE 1-1 MURO EJE 2-2 MURO EJE 3-3 MURO EJE A-A MURO EJE E-E 01.02.08.04 PINTURA EN CONTRAZOCALO CON ESMALTE SINTETICO EJE 2-2 EJE B-B ENTRE 1-1 Y 2-2 EJE 1-1 ENTRE B-B Y E-E EJE 1-1 ENTRE B-B Y E-E EJE 2-2 ENTRE A-A Y E-E EJE 3-3 ENTRE A-A Y E-E EJE A-A EJE B-B EJE C-C Y D-D EJE E-E 01.03.00 01.03.01 01.03.01.01 01.03.01.02 01.03.01.03 01.03.01.04 01.03.02 01.03.02.01 01.03.02.02 01.03.03 01.03.03.01 01.03.03.02 01.04.00 01.04.01 INSTALACIONES ELECTRICAS SALIDA PARA ELECTRICIDAD SALIDA PARA CENTRO DE LUZ SALIDA PARA TOMACORRIENTE DOBLE SALIDA PARA INTERRUPTOR DOBLE SALIDA PARA INTERRUPTOR SIMPLE TABLEROS, LLAVES E INTERRUPTORES TABLERO ELECT. GABINETE METALICO PARA DISTRIB. DE 2 CIRCUITOS INTERUPTOR TERMOMAGNETICO 2X30AMP. LUMINARIAS FLUORECENTE TUBULAR DOBLE (2X36W) INC. ACCESORIOS ARTEFACTO SPOT LIGHT JUNTAS DE DILATACION JUNTA DE CONSTRUCCION CON TEKNOPORT (COLUMNAS Y TABIQUES) Eje A-A entre EJE 1-1 Y 3-3 Eje C-C entre EJE 1-1 Y 3-3 EJE 2-2 EJE B-B Eje A-A Y C-C BAJO VIGAS DE CIMENTACION 01.04.02 JUNTA DE CONSTRUCCION CON TEKNOPORT (CUNETAS) CUNETA FRONTAL 01.04.03 JUNTAS CON ASFALTO ( PISOS Y VEREDAS) HISTORIAS CLINICAS CONSULTORIO MEDICINA FARMACIA TOPICO CUARTO DE REPOSO VEREDAS m m m Und Und Und Und PTO PTO PTO PTO m m m m m</p> <p>PARTIDA</p> <p>UND</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL</p> <p>124.00 1.00 3.00 2.00 5.00 4.00 15.50 8.00 0.90 0.25 1.00 1.00 8.00 15.50 3.74 3.74 0.65 0.65 124.00 78.27 10.10 1.87 26.00 40.30 172.69 1.00 1.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 8.2 1.8 3 13.605 2.75 2.15 3.15 6.26 6.26 6.26 6.76 1.8 13.605 2.75 6.26 2.40 3.37 9.2 9.2 3 2.35 14.35 3.13 2.13 3.62 7.01 7.01 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.95 2.65 2.65 2.65 2.65 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 14.54 4.77 15.90 27.51 7.29 11.40 8.35 33.18 33.18 16.59 39.88 4.77 27.51 7.29 16.59 0.48 0.67 1.84 1.84 1.20 0.47 2.87 0.63 0.85 1.45 5.61 1.40 96.04</p> <p>19.31</p> <p>2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00</p> <p>12.00 18.00 3.00 3.00 1.00 2.00</p> <p>12.00 18.00 3.00</p> <p>12.00 18.00 3.00</p> <p>1.00 2.00</p> <p>1.00 2.00</p> <p>7.00 5.00</p> <p>7.00 5.00</p> <p>7.00 5.00</p> <p>83.64 12.00 9.00 1.00 1.00 3.00 1.28 1.69 2.83 3.74 15.50 15.36 15.21 2.83 3.74 46.50 15.50 1.00 15.5 15.50 102.32 1.00 1.00 1.00 1.00 1.00 7.00 2.3 6.5 4.25 4.25 6.5 2.3 3.00 4.15 3.13 3.13 3.96 6.90 26.98 13.30 13.30 25.74 16.10</p> <p>1.00</p> <p>HOJA DE METRADOSOBRA: "CONSTRUCCION DE PUESTO SALUD DEL CENTOR POBLADO MOYA" UBICACIN: MOYA - QUINUA - HUAMANGA - AYACUCHO FECHA: JUNIO DEL 2011 N01.06.00 01.06.01</p> <p>PARTIDA ADQUISICIONESPARA MEDICINA</p> <p>UND Unid.</p> <p>CANT. N ELEM LARGO ANCHO ALTURA PARCIAL SUBTOTAL3.00</p> <p>3.00</p> <p>3.00</p> <p>HOJA DE METRADOS DE ACEROSItem 0101.02.01.02</p> <p>TOTALTotal(m.l) 1/2" Total(m.l) 5/8" Total(m.l) 3/4" Parcial(Kg) TOTAL KG</p> <p>Acero de Refuerzo</p> <p>Diam, (pulgada)</p> <p>KG/m</p> <p>N veces</p> <p>N piezas</p> <p>Long(m.l)</p> <p>Total(m.l) 1/4"</p> <p>Total(m.l) 3/8"</p> <p>CONSTRUCCION PUESTO DE SALUDACERO FY=4200KG/CM2, EN ZAPATAS.9 1/2" @.18</p> <p>204.37</p> <p>Zapata 1</p> <p>1.10 9 1/2" @.18</p> <p>1/2</p> <p>0.99</p> <p>8</p> <p>8</p> <p>1.10</p> <p>70.40</p> <p>69.978</p> <p>1.1010 1/2" @.18</p> <p>1/2</p> <p>0.99</p> <p>8</p> <p>8</p> <p>1.10</p> <p>70.40</p> <p>69.978</p> <p>Zapata 2</p> <p>1.00</p> <p>1/2 1/2</p> <p>0.99 0.99</p> <p>6 6</p> <p>6 6</p> <p>0.90 0.90</p> <p>32.40 32.40</p> <p>32.206 32.206</p> <p>10 1/...</p>